Maintenance, inspection and repair of flue gas cleaning systems

Maintenance, inspection and repair of flue gas cleaning systems

Maintenance/inspection and repair is done step by step. After carrying out the necessary repairs, flue gas cleaning plant has longer life and improved off vagina values you.  

  1. Determination of the condition (mechanical, procedural, Electrotechnical)

    This is documented by means of a report including photo / film material for you as a customer, so that you can convince yourself of the correctness of our diagnosis after completion of the inspection.

  2. Creating a solution concept

    We will submit a proposal of solution you after the inspection by means of photo – / film material. Together with your employees, we will develop a quick solution (procurement time of further spare parts / personnel , etc.)

  3. Create a repair plan

    The repair at this time is absolutely necessary or can be moved to a later date?

  4. Delivery of spare parts

    They come from either our or your magazine. If we both do not have the required spare part in stock, we will procure it as soon as possible and deliver it to the construction site.

  5. Implementation of the service work

    We will carry out the work with professionally qualified personnel . Our staff is trained in matters of health and safety at work and instructed by the management to always observe the guidelines for safety and health at work, to support your internal safety management and, if necessary, to draw the attention of you as a customer to safety deficiencies. But we assure you that we as quickly as possible will perform the repairs despite all security measures, because every hour of downtime costs you money as an entrepreneur.

  6. Monitoring of commissioning

    Upon completion of the works and technical acceptance, we will monitor the plant with one of our service technicians, to possible nor correct variables in the entire flue gas cleaning locally or to discuss with your coworkers in the plant room. Should delayed the commissioning due to other system components, we come gladly to later again to you in the work. This point is not applicable only if you expressly absolve us from this.

  7. Preparation of a detailed report

    After the successful commissioning, the system creates a repair report. This will give you mostly advance emailed as a PDF file. Of postal delivery then few days later both in paper form and on CD.

  8. Reporting incl. suggestions for improvement

    This report will contain recommendations in addition to the description of repair that will guarantee a longer plant life in our opinion; Our recommendations can be applied by you for the next revision plans. Which will save you lots of money as a plant operator.